Plug-in solar in Northern Ireland: current status

The short version: the change that makes plug-in solar workable from 27 August 2026 applies to Great Britain — England, Scotland and Wales. It does not currently extend to Northern Ireland.

Position as at the date of publication. We update this page when the position changes.

The position today

Plug-in solar in Great Britain rests on a specific package: a published technical specification for the device, listing on the ENA Connect Direct register, and connection and registration under the G98 arrangements operated by the GB distribution network operators. Northern Ireland has its own electricity distribution network and its own regulatory and connection framework. The Great Britain package does not automatically carry across.

That is a statement about the connection regime, not about the hardware. The physics is identical and the products are the same products. What is missing is the route that lets a householder connect one to a socket and record it in the way GB households will be able to.

What this means for households in Northern Ireland

We will not tell Northern Ireland customers that a product is legal there. Until the position changes, our GB-focused material should be read as exactly that.

What would need to change

Broadly, three things would need to line up: a technical specification for plug-in devices recognised in Northern Ireland, a connection and notification route through the local network operator equivalent to G98 and Connect Direct, and a register or equivalent means for a household to confirm that a specific product is acceptable. Whether and when that happens is a matter for the relevant Northern Ireland authorities and network operator. We are not going to guess at a timetable, and we would treat any date circulating online with caution unless it comes from an official source.

In the meantime

If you are in Northern Ireland and interested in plug-in solar, joining the waitlist is still worthwhile — it is how we will tell people if the position changes. It is not an order and it commits you to nothing. For the Great Britain picture, start with the complete plug-in solar guide and the rules and limits.

Frequently asked questions

Is plug-in solar legal in Northern Ireland?
The Great Britain plug-in solar regime, which applies from 27 August 2026 in England, Scotland and Wales, does not currently extend to Northern Ireland. NI households should check with their network operator before connecting any generation device.
Can I buy a plug-in solar kit and use it in Northern Ireland?
A product listed as Compliant on the ENA Connect Direct register is listed for the Great Britain arrangements. That listing does not by itself create a right to connect in Northern Ireland.
Will the rules change for Northern Ireland?
We cannot say. Any change would be a matter for the relevant Northern Ireland authorities and network operator, and we will not speculate on timing.

Be first to know when we launch.